
Incentivos para bombas de calor para edificios multifamiliares
Reciba decenas de miles de dólares en incentivos para actualizar su edificio de más de 5 unidades con tecnología de bomba de calor eficiente.

About
Be comfortable all year-round with heat pumps—the latest in efficient heating and cooling technology. Find the right one for you and your building.
Incentives
Category |
Description |
GSHP |
ASHP |
|
---|---|---|---|---|
Category |
Description |
GSHP New Construction |
Existing Buildings |
ASHP Existing Buildings |
Category 2c |
Description Multifamily Full Load ASHP Heating with Decommissioning |
GSHP N/A |
$5,000/dwelling unit |
ASHP $5,000/dwelling unit |
Category 4 |
Description Custom Space Heating Applications |
GSHP $125/MMBtu |
$200/MMBtu |
ASHP $200/MMBtu |
Category 4a |
Description Custom Space Heating Applications + Envelope – Tier 1 |
GSHP $125/MMBtu |
$200/MMBtu |
ASHP $200/MMBtu |
Category |
Description Custom Space Heating Applications + Envelope – Tier 2 |
GSHP $150/MMBtu |
$225/MMBtu |
ASHP $225/MMBtu |
Category 6 |
Description Custom Domestic Hot Water (“DHW”) |
GSHP $125/MMBtu |
$200/MMBtu |
ASHP $200/MMBtu** |
Category 6a |
Description Prescriptive Domestic Hot Water (“DHW”) |
GSHP $1,000 per dwelling unit |
$1,000 per dwelling unit |
ASHP $1,000/dwelling unit** |
Category 10 |
Description Custom Partial Load Space Heating Applications |
GSHP N/A |
$100/MMBtu |
ASHP $70/MMBtu |
Limited Time Offer (LTO) for Category 2C Projects
- Multifamily Full Load ASHP Heating with Decommissioning
- Available for buildings with 100 dwelling units or fewer
Incentive Rate |
Base Rate |
LTO Rate |
---|---|---|
Incentive Rate 2C MULTIFAMILY FULL LOAD ASHP HEATING WITH DECOMMISSIONING |
Base Rate $5,000/Dwelling Unit |
LTO Rate $7,000/Dwelling Unit |
LTO Important Dates
Stage |
Definition |
Date to Reach Stage |
---|---|---|
Stage Sold |
Definition All project documentation, W9, applications, form signatures are submitted. Master Case Identification Number (MCID#) must also be provided at this point. |
Date to Reach Stage May 31, 2025 |
Stage Passed Energy Services Final Inspection (Con Ed Energy Services) |
Definition Passed final inspection from Con Ed Energy Services |
Date to Reach Stage September 1, 2025 |
Stage Completed |
Definition Project scope of work is fully installed, and Statement of Completion (SOC) is signed and returned by customer |
Date to Reach Stage September 15, 2025 |
Stage Post-Inspected |
Definition Project has undergone post-inspection and all inspection flags and fails have been adequately cured |
Date to Reach Stage November 15, 2025 |
Stage Service Adequate (Con Ed Energy Services) |
Definition Project must be considered service adequate as determined by Con Ed Energy Services |
Date to Reach Stage December 1, 2025 |
Note:
- Acceptance of projects submitted for the LTO is subject to available budget and funding. A sold project may not guarantee access to rates. Failure to adhere to timelines or eligibility requirements will result in project incentive adjustment to base rates or may result in project cancellation.
- The effective start date is February 24, 2025. Projects sold before the effective start date are not eligible for the Limited Time Offer.
Elegibilidad
Lea el Manual del Programa de Calefacción Limpia Multifamiliar (PDF) para conocer todos los requisitos de elegibilidad.
- Debe ser propietario o administrar un edificio residencial multifamiliar con 5 o más unidades residenciales y tener una cuenta de electricidad elegible de Con Edison.
- Los proyectos de nueva construcción solo son elegibles para incentivos de bombas de calor geotérmicas, no para incentivos de bombas de calor aerotérmicas.
- Los edificios de uso mixto con espacios multifamiliares y comerciales pueden solicitar el programa según el tipo de uso dominante, el cual se determinará caso por caso.
- Todos los edificios existentes están sujetos al desmantelamiento del sistema de combustible fósil existente para el alcance del trabajo de calefacción del edificio.
- Los proyectos de alcance de trabajo que abarcan solo áreas comunes no son elegibles para los incentivos del programa Clean Heat.
- Los proyectos presentados no deberán haber iniciado la instalación.
Frequently Asked Questions
Definiciones de abreviaturas: Bomba de calor aerotérmica (ASHP). Bomba de calor aerotérmica central (CCASHP). Bomba de calor geotérmico (GSHP). Calentador de agua con bomba de calor (HPWH).
Los proyectos se consideran "Instalados" cuando todo el sistema de bomba de calor ha sido completamente instalado y está en pleno funcionamiento. Los proyectos que no cumplan con estos criterios serán elegibles para las Tasas de Incentivo Base.