Saltar al contenido principal
ajax loader animation
ajax loader animation

Incentivos para bombas de calor para edificios multifamiliares

Reciba decenas de miles de dólares en incentivos para actualizar su edificio de más de 5 unidades con tecnología de bomba de calor eficiente.

Envíe su solicitud ahora
buildings

About

Be comfortable all year-round with heat pumps—the latest in efficient heating and cooling technology. Find the right one for you and your building.

 

Incentives

Category

Description

GSHP

ASHP

Category

Description

GSHP

New Construction

Existing Buildings

ASHP

Existing Buildings

Category

2c

Description

Multifamily Full Load ASHP Heating with Decommissioning

GSHP

N/A

$5,000/dwelling unit

ASHP

$5,000/dwelling unit

Category

4

Description

Custom Space Heating Applications

GSHP

$125/MMBtu

$200/MMBtu

ASHP

$200/MMBtu

Category

4a

Description

Custom Space Heating Applications + Envelope – Tier 1

GSHP

$125/MMBtu

$200/MMBtu

ASHP

$200/MMBtu

Category

Description

Custom Space Heating Applications + Envelope – Tier 2

GSHP

$150/MMBtu

$225/MMBtu

ASHP

$225/MMBtu

Category

6

Description

Custom Domestic Hot Water (“DHW”)

GSHP

$125/MMBtu

$200/MMBtu

ASHP

$200/MMBtu**

Category

6a

Description

Prescriptive Domestic Hot Water (“DHW”)

GSHP

$1,000 per dwelling unit

$1,000 per dwelling unit

ASHP

$1,000/dwelling unit**

Category

10

Description

Custom Partial Load Space Heating Applications

GSHP

N/A

$100/MMBtu

ASHP

$70/MMBtu

Back to top

Limited Time Offer (LTO) for Category 2C Projects 

  • Multifamily Full Load ASHP Heating with Decommissioning 
  • Available for buildings with 100 dwelling units or fewer
     
Back to top

Incentive Rate

Base Rate

LTO Rate

Incentive Rate

2C MULTIFAMILY FULL LOAD ASHP HEATING WITH DECOMMISSIONING 

Base Rate

$5,000/Dwelling Unit

LTO Rate

$7,000/Dwelling Unit

LTO Important Dates

Stage

Definition

Date to Reach Stage

Stage

Sold

Definition

All project documentation, W9, applications, form signatures are submitted. Master Case Identification Number (MCID#) must also be provided at this point.

Date to Reach Stage

May 31, 2025

Stage

Passed Energy Services Final Inspection (Con Ed Energy Services)

Definition

Passed final inspection from Con Ed Energy Services

Date to Reach Stage

September 1, 2025

Stage

Completed

Definition

Project scope of work is fully installed, and Statement of Completion (SOC) is signed and returned by customer

Date to Reach Stage

September 15, 2025

Stage

Post-Inspected

Definition

Project has undergone post-inspection and all inspection flags and fails have been adequately cured

Date to Reach Stage

November 15, 2025

Stage

Service Adequate (Con Ed Energy Services)

Definition

Project must be considered service adequate as determined by Con Ed Energy Services

Date to Reach Stage

December 1, 2025

Note:

  • Acceptance of projects submitted for the LTO is subject to available budget and funding. A sold project may not guarantee access to rates. Failure to adhere to timelines or eligibility requirements will result in project incentive adjustment to base rates or may result in project cancellation. 
  • The effective start date is February 24, 2025. Projects sold before the effective start date are not eligible for the Limited Time Offer. 
     

Elegibilidad

Lea el Manual del Programa de Calefacción Limpia Multifamiliar (PDF) para conocer todos los requisitos de elegibilidad.

 

  • Debe ser propietario o administrar un edificio residencial multifamiliar con 5 o más unidades residenciales y tener una cuenta de electricidad elegible de Con Edison.
  • Los proyectos de nueva construcción solo son elegibles para incentivos de bombas de calor geotérmicas, no para incentivos de bombas de calor aerotérmicas.
  • Los edificios de uso mixto con espacios multifamiliares y comerciales pueden solicitar el programa según el tipo de uso dominante, el cual se determinará caso por caso.
  • Todos los edificios existentes están sujetos al desmantelamiento del sistema de combustible fósil existente para el alcance del trabajo de calefacción del edificio.
  • Los proyectos de alcance de trabajo que abarcan solo áreas comunes no son elegibles para los incentivos del programa Clean Heat.
  • Los proyectos presentados no deberán haber iniciado la instalación.
Back to top

Get Started

Step 1

Find an approved contractor.

Step 2

Let us know you’re interested.

Step 3

Fill out an application.
Back to top

Frequently Asked Questions

 

Back to top

Definiciones de abreviaturas: Bomba de calor aerotérmica (ASHP). Bomba de calor aerotérmica central (CCASHP). Bomba de calor geotérmico (GSHP). Calentador de agua con bomba de calor (HPWH).

 

Los proyectos se consideran "Instalados" cuando todo el sistema de bomba de calor ha sido completamente instalado y está en pleno funcionamiento. Los proyectos que no cumplan con estos criterios serán elegibles para las Tasas de Incentivo Base.

;