E-Mobility Advisory Services
Understand the grid capacity at your site, plan for future upgrades, and find out what electric rates are best for you.
About
Con Edison’s E-Mobility Advisory Services can help you understand the grid capacity where you operate, how to plan for future upgrades, and what electric rates may be best for you.
Site Assessment
A site assessment is a free, preliminary desktop review of the utility-side upgrades needed to support your electric vehicle project. It’s conducted in advance of a formal service request and does not require a site visit or customer-side equipment evaluation. You’ll get guidance on the ability of the existing electric service to meet your proposed charging load, the type and magnitude of utility-side work that may be required (if any), and estimated utility-side project timelines.
Get Started
To request a site assessment, please email us your completed Request Form with the following information:
- Location of your proposed charging station(s)
- Load (kW) information for your proposed chargers
- Vehicle details
- Load management plans
- Project schedule
If you are not the site owner, you will also need to email us a completed Letter of Authorization.
The E-Mobility team will review your site assessment request and send out your results within 2 weeks. We'll then set up a meeting with you to review the utility reinforcement plan, upcoming timelines, and how to submit a full-service request.
Electrification Capacity Map
The Electrification Capacity Map can help you gain a general understanding of grid capacity constraints in our service territory. It is a great place to start if you’re looking for a site to host EV chargers.
Charging Calculator
The charging calculator helps you project utility bill costs and potential savings from managed charging incentive program participation. It is the best way to understand how chargers and charging behaviors will affect your monthly bill.