PowerReady Incentive Dashboard
Current Incentive Caps
Please note that your eligibility tier provides the maximum incentive amount; your actual incentive will be determined in the Program Agreement (PA) stage, after you have received your energy service ruling. The incentive amount will vary depending on the maximum incentive eligibility level, total site costs, program budgets, and the general competitiveness of the project when compared to other projects.
Level 2 Plug Cost Caps
Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)
Incentive Tier |
Base Cost |
Speed Bonus |
Large Project Bonus |
Max Available |
Future Proofing |
---|---|---|---|---|---|
Incentive Tier Up to 50% |
Base Cost $5,000/per plug |
Speed Bonus $1,000/per plug |
Large Project Bonus $1,500/per plug |
Max Available $7,500/per plug |
Future Proofing 10% of eligible costs |
Incentive Tier Up to 90% |
Base Cost $9,000/per plug |
Speed Bonus $1,800/per plug |
Large Project Bonus $2,700/per plug |
Max Available $13,500/per plug |
Future Proofing 10% of eligible costs |
Incentive Tier Up to 100% |
Base Cost $10,000/per plug |
Speed Bonus $2,000/per plug |
Large Project Bonus $3,000/per plug** |
Max Available $15,000/per plug |
Future Proofing 10% of eligible costs |
*Large Project Bonus – Project must be 25 plugs or more, can only be applied to the first 100 plugs.
**The 25-plug minimum is waived for this tier (up to the first 100 plugs).
DCFC kW Cost Caps
Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)
Incentive Tier |
Base Cost Cap |
Speed Bonus* |
Load Mgmt Bonus** |
Max Available Cap |
Charger Hub |
Max Available Cost Cap |
Future Proofing Bonus |
---|---|---|---|---|---|---|---|
Incentive Tier Up to 50% |
Base Cost Cap $400/kW |
Speed Bonus* $50/kW |
Load Mgmt Bonus** $25/kW |
Max Available Cap $475/kW |
Charger Hub N/A |
Max Available Cost Cap N/A |
Future Proofing Bonus 10% of eligible costs |
Incentive Tier Up to 90% |
Base Cost Cap $720/kW |
Speed Bonus* $90/kW |
Load Mgmt Bonus** $45/kW |
Max Available Cap $855/kW |
Charger Hub $225/kW |
Max Available Cost Cap $945/kW |
Future Proofing Bonus 10% of eligible costs |
Incentive Tier Up to 100% |
Base Cost Cap $800/kW |
Speed Bonus* $100/kW |
Load Mgmt Bonus** $50/kW |
Max Available Cap $950/kW |
Charger Hub $250/kW |
Max Available Cost Cap $1,050/kW |
Future Proofing Bonus 10% of eligible costs |
*Speed Bonus: Must be a service adequate project that completes installation within 6 months of signing program agreement. Cannot be combined with Interconnection bonus.
**Load Management Bonus: Rules are under development, cannot be combined with Interconnection bonus.
***Interconnection Bonus: Service Inadequate/ Public 10+. Must have significant interconnection costs such as new service or block house. Cannot be combined with any other bonus.
Waitlist Status |
|
---|---|
Waitlist Status L2 Disadvantaged Community (DAC) waitlist |
We are currently working through the waitlist of active projects that applied for the “up to 100%” incentive tier. We are currently not accepting any additional projects for this waitlist. |
Waitlist Status L2 general program waitlist |
No waitlist |
Waitlist Status DCFC general program waitlist |
No waitlist |
Plug Pipeline* |
Installed Complete |
Installed Validation |
Committed |
In Pipeline |
Stand-By |
Not Yet Applied |
2025 Target |
---|---|---|---|---|---|---|---|
Plug Pipeline* All L2 Plugs |
Installed Complete 9,460 |
Installed Validation 1,900 |
Committed 4,650 |
In Pipeline 10,770 |
Stand-By 0 |
Not Yet Applied 0 |
2025 Target 21,371 |
Plug Pipeline* Up to 50% |
Installed Complete 5,180 |
Installed Validation 1,300 |
Committed 2,530 |
In Pipeline 6,000 |
Stand-By |
Not Yet Applied |
2025 Target |
Plug Pipeline* Up to 90% |
Installed Complete 2,090 |
Installed Validation 360 |
Committed 1,820 |
In Pipeline 4,170 |
Stand-By |
Not Yet Applied |
2025 Target |
Plug Pipeline* Up to 100% |
Installed Complete 2,160 |
Installed Validation 170 |
Committed 290 |
In Pipeline 430 |
Stand-By |
Not Yet Applied |
2025 Target |
Plug Pipeline* Mixed Tier |
Installed Complete 30 |
Installed Validation 70 |
Committed 10 |
In Pipeline 170 |
Stand-By |
Not Yet Applied |
2025 Target |
Plug Pipeline* |
Installed Complete |
Installed Validation |
Committed |
In Pipeline |
Stand-By |
Not Yet Applied |
2025 Target |
---|---|---|---|---|---|---|---|
Plug Pipeline* All DCFC Plugs |
Installed Complete 400 |
Installed Validation 140 |
Committed 490 |
In Pipeline 1,420 |
Stand-By 0 |
Not Yet Applied 700 |
2025 Target 3,127 |
Plug Pipeline* Up to 50% |
Installed Complete 250 |
Installed Validation 60 |
Committed 110 |
In Pipeline 150 |
Stand-By |
Not Yet Applied |
2025 Target |
Plug Pipeline* Up to 90% |
Installed Complete 60 |
Installed Validation 40 |
Committed 150 |
In Pipeline 620 |
Stand-By |
Not Yet Applied |
2025 Target |
Plug Pipeline* Up to 100% |
Installed Complete 70 |
Installed Validation 30 |
Committed 220 |
In Pipeline 600 |
Stand-By |
Not Yet Applied |
2025 Target |
Plug Pipeline* Mixed Tier |
Installed Complete 20 |
Installed Validation 10 |
Committed 10 |
In Pipeline 60 |
Stand-By |
Not Yet Applied |
2025 Target |
Installed includes both completed projects and projects notified as fully installed by participant, but not yet validated by Con Edison.
*Values are rounded to the nearest 10 plugs
Budget Pipeline ($M) |
Installed Complete |
Installed Validation |
Committed* |
Estimated in Pipeline** |
Not Yet Applied*** |
2025 Budget |
---|---|---|---|---|---|---|
Budget Pipeline ($M) L2 Funds |
Installed Complete $95.3 |
Installed Validation $14.2 |
Committed* $41.4 |
Estimated in Pipeline** $88.4 |
Not Yet Applied*** $0.0 |
2025 Budget $237.8 |
Budget Pipeline ($M) Up to 50% |
Installed Complete $37.0 |
Installed Validation $7.7 |
Committed* $16.7 |
Estimated in Pipeline** $36.5 |
Not Yet Applied*** |
2025 Budget |
Budget Pipeline ($M) Up to 90% |
Installed Complete $24.9 |
Installed Validation $3.6 |
Committed* $20.3 |
Estimated in Pipeline** $46.3 |
Not Yet Applied*** |
2025 Budget |
Budget Pipeline ($M) Up to 100% |
Installed Complete $33.1 |
Installed Validation $2.2 |
Committed* $4.3 |
Estimated in Pipeline** $5.7 |
Not Yet Applied*** |
2025 Budget |
Budget Pipeline ($M) Mixed Tier |
Installed Complete $0.2 |
Installed Validation $0.7 |
Committed* $0.1 |
Estimated in Pipeline** $0.0 |
Not Yet Applied*** |
2025 Budget |
Budget Pipeline ($M) |
Installed Complete |
Installed Validation |
Committed* |
Estimated in Pipeline** |
Not Yet Applied*** |
2025 Budget |
---|---|---|---|---|---|---|
Budget Pipeline ($M) DCFC Funds |
Installed Complete $9.4 |
Installed Validation $4.7 |
Committed* $32.4 |
Estimated in Pipeline** $153.8 |
Not Yet Applied*** $161.0 |
2025 Budget $347.2 |
Budget Pipeline ($M) Up to 50% |
Installed Complete $4.2 |
Installed Validation $1.4 |
Committed* $2.3 |
Estimated in Pipeline** $5.5 |
Not Yet Applied*** |
2025 Budget |
Budget Pipeline ($M) Up to 90% |
Installed Complete $1.6 |
Installed Validation $1.6 |
Committed* $12.5 |
Estimated in Pipeline** $70.0 |
Not Yet Applied*** |
2025 Budget |
Budget Pipeline ($M) Up to 100% |
Installed Complete $3.2 |
Installed Validation $1.4 |
Committed* $16.9 |
Estimated in Pipeline** $78.3 |
Not Yet Applied*** |
2025 Budget |
Budget Pipeline ($M) Mixed Tier |
Installed Complete $0.4 |
Installed Validation $0.3 |
Committed* $0.6 |
Estimated in Pipeline** $0.0 |
Not Yet Applied*** |
2025 Budget |
Installed includes all funds that are committed, including projects that are paid out and projects to which Con Edison has committed funds via signed Payment Agreements.
* Funds committed to projects not yet installed are subject to change once incentives are finalized and paid out.
**Estimate of funds it would take to incentivize all plugs in the pipeline, including the wait list, and this value may exceed the program authorized budget.
*** Not yet applied captures the estimated budget available if all applied projects were to be installed. Some applied projects will not move forward so interested participants are encouraged to apply since additional budget may be available.