Commercial and Industrial Program Tools and Technical Guidelines
Review and reference these detailed guides when completing your application.
Program Tools and Documents
Use these tools to complete your project application and calculate details for prescriptive projects.
Tools
- Boiler Clean and Tune-Up Calculator version 25.0
- Building Envelope Tool version 25.0
- Electric Measure Tool version 25.0
- Elevator Modernization Estimator version 25.0
- Fuel Switch Calculator version 25.0
- Gas Measure Tool version 25.0
- Pipe Insulation Survey version 25.0
- Steam Trap Survey version 25.0
Forms
- Scope of Work Change Form – If you need to make any changes to your project after you’ve submitted an application, but before you’ve submitted a completion certificate, please submit this form to your dedicated energy advisor.
- Project Installation Plan
- Certificate of Insurance (example)
- W9 (example)
For detailed information about measure requirements, refer to our program manual.
Technical Guidelines
Use our detailed technical guidelines to help you complete your application for projects that include custom measures.
- All Custom Measures
- Building Automation System/Energy Management Systems
- Building Envelope
- Data Center Equipment
- Early Replacement
- Extended Life
- Fuel Switching Guide
- Prescriptive Interior & Exterior Lighting Guide
- Refrigerated Display Cases
- Refrigerator Compressor Rack Systems
- Sample Project Information Template
- Variable Speed Domestic Water Booster Pump System
- Fan Wall Technical Guidelines 2025
- Induction Unit Projects
- Variable Frequency Drive (Variable Speed Drive)
- Equipment Efficiency Derating
All measures, incentives, and program rules are subject to change at the discretion of Con Edison without prior written notification