PowerReady Contractor Program Documents and Tools
Download helpful materials, program manuals, and detailed participation guidelines.
Guides and Fact Sheets
- Preliminary Document Checklist (PDF) Overview of required engineering documents to upload as part of the PowerReady application
- Load Letter Guidance (PDF) Template of load letter outlining the load type of size of project.
- Site Plan Guidance Document (PDF)
- One-Line Diagram Guidance (PDF)
- PowerReady EV Project Closeout Checklist (PDF) Reviews all documents that must be completed in order to close-out project and receive payment.
- Participant Guide (PDF) Includes program specifics, such as eligibility criteria, enrollment instructions, and post-enrollment requirements for all New York State make-ready programs.
- Fact Sheet (PDF) Includes general program information and program process.
- EV Charging Station Installation Guide (PDF) How to request electric service when you install EV chargers and process your application and other documentation.
Please note that per our safety guidelines, contractors must file all electrical upgrades, including the installation of Level 2 EV chargers by visiting our Gas and Electric Service Update Guide.
- Fleet Operator Electrification Guide (PDF) Learn how to submit a service request.
- EV PowerReady Program Permitting Guide (PDF) Provides general guidance regarding permitting requirements in NYC.
- Site Public Accessibility Clarifications (PDF) Provides additional guidance on site accessibility for incentive tier qualification.
- DOT Toolkit (PDF) View highlights of the U.S. Department of Transportation's Urban E-Mobility Toolkit.
- Electric Blue Book (PDF) Provides specifications for electrical service installations.
PowerReady Program Portal Documents
- Letter of Authorization Form (File will download) Authorization document to be signed by customer site host authorizing Con Edison to speak to developer/contractor about their project.
- Load Letter Blank Form (PDF)
- Application for Service (PDF) Required account application if project is requesting a new meter.
- Electric Checklist (PDF) Permit signoff required by the authority having jurisdiction.
- Contractor Certification Template (PDF) For all service adequate projects, a certification is required for work completed.